391

[T]he report's executive summary certainly gets to the heart of their findings.

"The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs," says the report. "But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb."

you are viewing a single comment's thread
view the rest of the comments
[-] vzq@lemmy.world 3 points 3 months ago

Surely you made a typo? 50 MW is a tenth of the electrical yield of the smallest PWR you can profitably operate.

[-] alcoholicorn@lemmy.ml 5 points 3 months ago

Off by a factor of 1000. That's why I'm not a nuclear engineer.

[-] flambonkscious@sh.itjust.works 1 points 3 months ago

So, there's this thing called Java...

this post was submitted on 01 Jun 2024
391 points (97.6% liked)

Technology

58143 readers
4419 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS